Aerobic Septic Installation in Kendall County

Building on acreage with no sewer? We design, permit and install a TCEQ-licensed aerobic system sized for your Kendall County lot, and start the required maintenance from day one.

Aerobic Septic Installation

A huge share of new construction in Kendall County is on acreage with no sewer line anywhere near it, and on Hill Country ground that means an aerobic system is the only viable answer. We design, permit and install complete aerobic treatment units (ATUs) across the county, from the subdivisions filling in along I-10 and Highway 46 outside Boerne to custom homes on raw land toward Kendalia, Sisterdale and Comfort, and the large lots in Cordillera Ranch and Tapatio Springs. A proper install starts with a site evaluation and soil analysis, then a system sized to the home and approved by Kendall County, set with the trash tank, aeration chamber and pump tank, the compressor and electrical controls, the chlorination, and the spray distribution laid out to cover the required area without hitting the house, the well or the property line. We are licensed installers who do it by the book: the right design, the right permit, an inspection that passes the first time, and a system that will run clean for decades if it is maintained.

It starts with the soil and the permit

You cannot install a system until you know what the ground can take. We do a site evaluation and soil analysis, calculate the wastewater load from the number of bedrooms and design a system the county will approve. On Kendall County lots the limiting factor is almost always the soil and the available area for spray distribution. We lay the system out so it meets every setback from the well, the house, the property line and any creek or drainageway, then pull the permit and handle the inspections with the county.

A complete, code-compliant install

An aerobic install is a full system, not a tank in a hole. We set the trash tank that catches solids, the aeration chamber where air is pumped in to grow the bacteria that treat the waste, and the pump tank that holds and doses treated effluent. We wire the air compressor, control panel, floats, chlorinator and the audible and visual alarm, then install the spray heads or drip field across the designated area. Everything is sized, placed and documented to TCEQ and county standards so it passes inspection and runs right.

Built to last, and to stay compliant

A well-installed aerobic system is a long-term asset, but Texas requires it to be under a maintenance contract from day one. We start your two-year initial maintenance period at install and set you up on the required four-month inspection schedule, so the system is covered, compliant and watched over from the moment it is turned on. Build it right and maintain it, and an ATU will quietly treat your household wastewater for decades.

What’s included

  • Site evaluation and soil analysis before any design
  • System sized to bedrooms and approved by Kendall County
  • Trash tank, aeration chamber and pump tank set correctly
  • Compressor, control panel, chlorinator, floats and alarm wired
  • Spray heads or drip field laid out to required setbacks
  • Permitting and inspections handled by licensed installers

Get Help With Aerobic Install

Tell us where your system is and what is going on. We will call you back with a quote.

Prefer to talk now? Call or text (830) 516-0729.

Aerobic Install: Questions We Hear a Lot

How long does a new aerobic system installation take?
Once the site evaluation, design and permit are in hand, the physical install of a typical residential aerobic system usually takes a few days, plus time for the county inspection and final hookup. The biggest variable is permitting and soil work up front, so the sooner we start the evaluation, the sooner you can be running.
What determines the size and cost of my system?
Mainly the number of bedrooms, which sets the design wastewater flow, plus your soil and how much area you have for spray distribution. Tighter soils or limited yard space can require a larger pump tank or drip distribution. We do the site evaluation first so you get a system sized correctly for your home and a real price, not a guess.
Do I have to maintain a brand-new system right away?
Yes. Texas requires an aerobic system to be under a maintenance contract from installation, including the standard two-year initial maintenance period and inspections every four months. We start that contract at install and keep your reports filed with Kendall County, so you are compliant from day one.

Need Aerobic Install in Kendall County?

Call now for a fast quote. We come to your property, and backups and emergencies get priority.

📞 Call or text (830) 516-0729